GM Certified
Purchase the following equipment to help you become GM Certified
The following list serves as a guideline and reference for the products you need to become certified. Please contact GM directly for an updated list of requirements.
GM Basic Tools List
REQUIRED EQUIPEMENT | PRODUCT IMAGE | PRODUCT NAME |
---|---|---|
Hand Tools | ||
Heat Monitoring System | ||
Crack and Dye Penetrant Kit | ||
Blind Structural Rivet Gun | Milwaukee Rivet Tool | |
Pulse Mig Welder | MULTIMIG 522 – Aluminum Welder | |
Torque Wrench | Miwaukee Torque Wrench | |
Coolant Pressure Tester | OTC Universal Cooling System Pressure Tester | |
Dent Removal Aluminum | Multitool Workstation with M35 | |
Frame Rack | CHIEF PHOENIX™ PULLING RACK | |
Measuring System | Meridian Live Mapping System | |
STRSW Spot Welder | Mi300T – Spot Welder | |
Mig/Mag | MULTIMIG 522 – Aluminum Welder | |
Mig Brazing | MULTIMIG 522 – Aluminum Welder | |
Aluminum Mig | MULTIMIG 522 – Aluminum Welder | |
Test Weld Station | Destructive Weld Test Stand | |
Bench mount vise | Bench Vise | |
Steel Dent removal | Multitool Workstation with M35 | |
AC | Rotary R3AC80 | |
Battery Charger | Schumacher Electric 200/40/20/10 Amp Manual Wheel Charger w/ Engine Sta | |
Battery Load Tester | Topdon BT20 – Battery Load/Voltage Tester, Cranking & Charging Test w/App | |
Two Post Lift | Forward Lift i10 Two Post Life | |
Wheel Alignment | Rotary R1090 | |
Engine Hoist | K Tool International 2-Ton Foldable Engine Crane | |
Engine Cart | Sunex 1 Ton Engine Stand | |
Immersion Type Wet Mix Dust Extraction System | Eurovac II Wet Mix Dust Collector |
GM Fleet – Brigthdrop
REQUIRED EQUIPEMENT | PRODUCT IMAGE | PRODUCT NAME |
---|---|---|
Minimum 15,000 lb. 3-stage/Max Reach hoist | Rotary SP016 | |
12,000 lb. Frame Rack/Fixture Bench | CHIEF PHOENIX™ PULLING RACK |
ICE Speciality – C8 & CT6 Rack and Accessories
REQUIRED EQUIPEMENT | PRODUCT IMAGE | PRODUCT NAME |
---|---|---|
22” Frame Rack | CHIEF PHOENIX™ PULLING RACK | |
Structural Holding with the CT-6 Attachements | Structural Holding Package |
FAST-TRACK YOUR CERTIFICATION PROCESS!
READY TO MEET THE REQUIREMENTS?
Request a quote for our GM Package and take the first step towards certification.